Site prep and the base
The area is cleared of topsoil, grass and any soft organic material, which rots down and leaves voids if it is left in. The ground is then levelled and the base built up, usually compacted crushed rock, to give the slab a firm, even platform. On Toowoomba's reactive black soil this usually means deeper footings or beams taken past the worst of the movement and, for a habitable slab, a stiffened or waffle raft design so the whole slab can bridge the clay swelling and shrinking underneath.
Formwork is set to the slab outline and levels, allowing for the falls the slab needs so water runs off rather than pooling. Getting the finished height right matters where a slab meets an existing floor, a path or a driveway, so there is no step or dam.